Skip to content

Contact Info

Office
IFZA Business Park, Building A1, Dubai Digital Park, Dubai Silicon Oasis, Dubai, United Arab Emirates
Hours
Mon–Fri: 9:00 AM – 5:00 PM (Dubai time, GMT+4)

Social Media

Courses

HomeCoursesEnglishHealth, Safety & Environment (HSE)Permit to Work and Lockout/Tagout (LOTO)

Permit to Work and Lockout/Tagout (LOTO)

English

US$59

Permit to work systems and isolation of hazardous energy.
  • FieldHealth, Safety & Environment (HSE)
  • Level2 · Intermediate
  • Duration4 h 15 min
  • Course languageEnglish
  • IncludesNarrated videos, interactive activities, final assessment and a verifiable certificate

Instant course access as soon as payment is confirmed.

🌐 This course is in English. You need to be fluent in English to follow it.

Or include this course in an annual plan — from US$499/year · See plans ›

Category: SKU: SST-705 Categories: , ,

Many of the most serious industrial accidents happen during maintenance, when someone opens a line they thought was empty or works on a machine that suddenly starts up. In this course for permit issuers and receivers, supervisors and maintenance technicians, you follow the team at a fictitious gas processing plant. Understand the purpose and components of a permit to work system and the lesson of Piper Alpha on permits and shift handover. Follow the life cycle of a permit, from request to close-out, with the roles of the requester, the issuer, the area authority, the performing authority and the isolation authority, the JSA, supporting certificates, the site visit, suspension, shift handover and simultaneous operations. Apply the steps of isolation and lockout of hazardous energy (LOTO): prepare, switch off, isolate, lock and tag, dissipate and verify, with group lockout and a lockbox. Finally, recognise typical failures, stop and reassess when conditions change, and learn about field verification and system audits. Aligned with the British HSE guides HSG250 and HSG253 and the IOGP Life-Saving Rules. This course does not authorise anyone to issue or accept permits or to carry out isolations: that requires formal authorisation by the site and a competence assessment.

What you will learn

  • Explain the purpose and components of a permit to work system and the lessons of Piper Alpha.
  • Identify the work that requires a permit and the associated supporting certificates.
  • Describe the life cycle of a permit and the roles of each person involved.
  • Explain suspension, shift handover, close-out and the coordination of simultaneous operations.
  • Apply the steps of isolation and lockout of hazardous energy, including group lockout and padlock removal.
  • Recognise typical system failures, stop and reassess when conditions change, and support field verification.

Modules

  1. Why permits to work exist56 min
  2. The permit life cycle58 min
  3. Isolation of hazardous energy (LOTO)61 min
  4. Typical failures and field verification65 min

Who it is for

Permit issuers and receivers, supervisors and maintenance technicians

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

Cookie preferences
Home Courses Plans Cart Login