Subsea Systems: Christmas Trees, Risers and Umbilicals
English
US$79
- FieldOil & Gas
- Level2 · Intermediate
- Duration6 h 45 min
- Course languageEnglish
- IncludesNarrated videos, interactive activities, final assessment and a verifiable certificate
Instant course access as soon as payment is confirmed.
🌐 This course is in English. You need to be fluent in English to follow it.
Prerequisites: OGP-604 Offshore Life and Safety: Theory Preparation
🔒 This course opens once you complete: SST-601 Workplace Safety Induction (HSE Induction), OGP-604 Offshore Life and Safety: Theory Preparation
Path: SST-601 → OGP-604 → OGP-714
Or include this course in an annual plan — from US$499/year · See plans ›
More than a thousand metres down, where no diver works, wells, valves, lines and cables have to keep working for decades, controlled remotely from an FPSO. In this intermediate course for engineers and technicians working on deepwater projects and operations, you follow Kyle, a subsea systems engineer at South Atlantic Petroleum, a fictitious operator, and the team of the field tied back to the FPSO Blue Horizon. Describe the architecture of a subsea field, tie-backs and the system life cycle. Identify the components of the wellhead and of vertical and horizontal Christmas trees. Explain the role of manifolds, rigid and flexible lines and risers, and flow assurance risks such as hydrates and wax. After learning about umbilicals, electro-hydraulic control and chemical injection, diagnose a loss of communication with a tree in a scenario. Plan, in theory, the inspection, maintenance and intervention of a fictitious field, using vessels, ROVs and light and heavy well intervention. Aligned with API RP 17A / ISO 13628-1, API Spec 17D and API Spec 17E.
What you will learn
- Describe the architecture of a subsea field tied back to an FPSO and the life cycle of a subsea system.
- Identify the components of a subsea wellhead and of a wet Christmas tree, vertical or horizontal.
- Explain the role of manifolds, flowlines and risers and the main flow assurance risks.
- Describe umbilicals, the electro-hydraulic control system and chemical injection.
- Diagnose, in a scenario, a simple control system failure, such as a loss of communication with a tree.
- Plan, in theory, the inspection, maintenance and intervention of a subsea system, with the right vessels, ROVs and types of intervention.
Modules
- Architecture of a subsea field76 min
- Subsea Christmas trees and wellheads77 min
- Manifolds, flowlines and risers72 min
- Umbilicals and control systems83 min
- Installation, inspection and intervention82 min
Who it is for
Engineers and technicians working on deepwater projects and operations
Only logged in customers who have purchased this product may leave a review.





Reviews
There are no reviews yet.