Turnaround and Major Shutdown Management
English
US$129
- FieldOil & Gas
- Level3 · Advanced
- Duration8 h 15 min
- Course languageEnglish
- IncludesNarrated videos, interactive activities, final assessment and a verifiable certificate
Instant course access as soon as payment is confirmed.
🌐 This course is in English. You need to be fluent in English to follow it.
Prerequisites: OGP-705 Asset Integrity and Equipment Inspection
🔒 This course opens once you complete: OGP-602 The Value Chain: Upstream, Midstream and Downstream, OGP-705 Asset Integrity and Equipment Inspection
Path: OGP-602 → OGP-705 → OGP-809
Or include this course in an annual plan — from US$1,649/year · See plans ›
Every few years, a refinery or an FPSO stops on purpose to inspect, repair and improve what cannot be dealt with while it is running, with hundreds of people working at the same time and an enormous cost for every day offline. In this advanced course you will follow the team at North Coast Refinery, a fictitious refinery, and a partial shutdown on the FPSO Blue Horizon: the role of shutdowns, the cost of lost production and the risks of the transient phases of shutdown and start-up; risk-based scope selection, the scope freeze and the long-term milestones; work packages, the critical path, the budget and long-lead materials, with a spreadsheet exercise; contracting strategy, organisation and contractor management, including offshore logistics; safety controls during execution, from isolations to the pre-start-up safety review (PSSR); and control of the execution and the post-shutdown review. Aligned with the CCPS guidance on transient operations (2021) and with ISO 55001:2024. Theoretical course: it does not replace certified practical training in isolations, confined spaces, gas testing or lifting operations.
What you will learn
- Explain the role of shutdowns, the cost of lost production and the risks of the transient phases of shutdown and start-up.
- Define and freeze the scope of a shutdown on the basis of risk and to plan the phases and the long-term milestones.
- Build a detailed plan with a critical path, a budget with contingency and a plan for long-lead materials.
- Choose the contracting strategy and the organisation for a shutdown and to manage contractors, including offshore logistics.
- Identify the safety controls for shutdown and start-up, including isolations, confined spaces, hot work, lifts, simultaneous operations and PSSR.
- Control the execution of a shutdown and lead the post-shutdown review.
Modules
- What a shutdown is and why it is critical80 min
- Scope and long-term planning79 min
- Detailed planning, budget and materials82 min
- Contracting and organisation78 min
- Safety during execution77 min
- Execution, control and lessons84 min
Who it is for
Operations and maintenance managers, planners and shutdown coordinators in refineries and on FPSOs
Only logged in customers who have purchased this product may leave a review.





Reviews
There are no reviews yet.